(10-06-2023, 11:26 AM)chasetownbaggie Wrote: (10-06-2023, 11:07 AM)Protheroe Wrote: (10-06-2023, 06:32 AM)chasetownbaggie Wrote: I hope at some point there is an Inquiry held into the running of this whole project.
You don't need an Inquiry to tell you that building a tunnel virtually all the way from London to Birmingham to appease Tory voters in Bucks & Oxon was going to be more expensive than the engineering initially envisaged.
Nonetheless, the reasons should be put out there, so the public know why and highlight any wrongdoing. I suspect there's incompetence, corruption and profligacy AOTS at HS2. Name and shame. I saw a report on HS2 on a news channel the other day, when speculation was rife. Basically, civil servants at The Department Of Transport were asked over 10 years back to look into a High Speed rail link, estimated it to cost£33 Billion. Apparently, they just looked at lines on a map, took no account of having to build tunnels, bridges etc. Or allow some leeway for inflation.
A company, HS2 Ltd was set up, the top dogs on massive money, one of whom admitted that` We may have underestimated the logistics of building such a large project`. Why are they in such jobs ? Incompetent.
Posts: 13,568
Threads: 492
Joined: Jan 2019
Reputation:
40
10-06-2023, 12:05 PM
(This post was last modified: 10-06-2023, 12:07 PM by Borin' Baggie.)
(10-06-2023, 11:34 AM)Ministry Of Silly Signings Wrote: (10-06-2023, 11:26 AM)chasetownbaggie Wrote: (10-06-2023, 11:07 AM)Protheroe Wrote: (10-06-2023, 06:32 AM)chasetownbaggie Wrote: I hope at some point there is an Inquiry held into the running of this whole project.
You don't need an Inquiry to tell you that building a tunnel virtually all the way from London to Birmingham to appease Tory voters in Bucks & Oxon was going to be more expensive than the engineering initially envisaged.
Nonetheless, the reasons should be put out there, so the public know why and highlight any wrongdoing. I suspect there's incompetence, corruption and profligacy AOTS at HS2. Name and shame. I saw a report on HS2 on a news channel the other day, when speculation was rife. Basically, civil servants at The Department Of Transport were asked over 10 years back to look into a High Speed rail link, estimated it to cost£33 Billion. Apparently, they just looked at lines on a map, took no account of having to build tunnels, bridges etc. Or allow some leeway for inflation.
A company, HS2 Ltd was set up, the top dogs on massive money, one of whom admitted that` We may have underestimated the logistics of building such a large project`. Why are they in such jobs ? Incompetent.
They did, they just didn't take into account stuff like if we cross over this railway we might need to accommodate it being doubled in the near future.
HS2 Ltd also refused to hire the guy who was in charge of HS1 because he wanted the messaging to be all about capacity (because that's the point) instead of speed which the DfT and HS2 Ltd didn't like.
I guarantee that if they had just gone with a 200mph railway in the first place the costs would have been way down but the government wanted the "fastest conventional railway in the world".
So it looks like they spent £1.5m on buying a house on the 2nd, that's £1.5m they wasted so Sunak could announce a decision he had clearly made ages ago at the conference.
Absolute pisstake, Sunak has enough money he should pay that himself.
Posts: 11,311
Threads: 419
Joined: Feb 2020
Reputation:
18
10-06-2023, 01:36 PM
(This post was last modified: 10-06-2023, 01:37 PM by Protheroe.)
(10-06-2023, 12:05 PM)Borin' Baggie Wrote: (10-06-2023, 11:34 AM)Ministry Of Silly Signings Wrote: (10-06-2023, 11:26 AM)chasetownbaggie Wrote: (10-06-2023, 11:07 AM)Protheroe Wrote: (10-06-2023, 06:32 AM)chasetownbaggie Wrote: I hope at some point there is an Inquiry held into the running of this whole project.
You don't need an Inquiry to tell you that building a tunnel virtually all the way from London to Birmingham to appease Tory voters in Bucks & Oxon was going to be more expensive than the engineering initially envisaged.
Nonetheless, the reasons should be put out there, so the public know why and highlight any wrongdoing. I suspect there's incompetence, corruption and profligacy AOTS at HS2. Name and shame. I saw a report on HS2 on a news channel the other day, when speculation was rife. Basically, civil servants at The Department Of Transport were asked over 10 years back to look into a High Speed rail link, estimated it to cost£33 Billion. Apparently, they just looked at lines on a map, took no account of having to build tunnels, bridges etc. Or allow some leeway for inflation.
A company, HS2 Ltd was set up, the top dogs on massive money, one of whom admitted that` We may have underestimated the logistics of building such a large project`. Why are they in such jobs ? Incompetent.
They did, they just didn't take into account stuff like if we cross over this railway we might need to accommodate it being doubled in the near future.
HS2 Ltd also refused to hire the guy who was in charge of HS1 because he wanted the messaging to be all about capacity (because that's the point) instead of speed which the DfT and HS2 Ltd didn't like.
I guarantee that if they had just gone with a 200mph railway in the first place the costs would have been way down but the government wanted the "fastest conventional railway in the world".
So it looks like they spent £1.5m on buying a house on the 2nd, that's £1.5m they wasted so Sunak could announce a decision he had clearly made ages ago at the conference.
Absolute pisstake, Sunak has enough money he should pay that himself.
I used to work with the guy who became "Head of Station Development" at HS2. Incompetence and profligacy could have been his middle names in the time we were in the same team. It's also interesting to note just how many former Advantage West Midlands (remember that?) staff decamped to HS2 after AWM was scrapped; it's hardly surprising progress has been so slow when it's in the hands of that lot.
Say what you want about Andy Street, but he's delivered 10 times brownfield regeneration in 5 years than AWM managed in 15.
Posts: 6,416
Threads: 305
Joined: Aug 2022
Reputation:
28
Had plenty of funding from AWM back in the day
Someone could have been killed
Posts: 11,311
Threads: 419
Joined: Feb 2020
Reputation:
18
(10-06-2023, 01:50 PM)CaptainFantastico Wrote: Had plenty of funding from AWM back in the day
Everybody did. All that was missing were outcomes.
Posts: 11,922
Threads: 798
Joined: Oct 2022
Reputation:
50
(10-06-2023, 12:05 PM)Borin' Baggie Wrote: (10-06-2023, 11:34 AM)Ministry Of Silly Signings Wrote: (10-06-2023, 11:26 AM)chasetownbaggie Wrote: (10-06-2023, 11:07 AM)Protheroe Wrote: (10-06-2023, 06:32 AM)chasetownbaggie Wrote: I hope at some point there is an Inquiry held into the running of this whole project.
You don't need an Inquiry to tell you that building a tunnel virtually all the way from London to Birmingham to appease Tory voters in Bucks & Oxon was going to be more expensive than the engineering initially envisaged.
Nonetheless, the reasons should be put out there, so the public know why and highlight any wrongdoing. I suspect there's incompetence, corruption and profligacy AOTS at HS2. Name and shame. I saw a report on HS2 on a news channel the other day, when speculation was rife. Basically, civil servants at The Department Of Transport were asked over 10 years back to look into a High Speed rail link, estimated it to cost£33 Billion. Apparently, they just looked at lines on a map, took no account of having to build tunnels, bridges etc. Or allow some leeway for inflation.
A company, HS2 Ltd was set up, the top dogs on massive money, one of whom admitted that` We may have underestimated the logistics of building such a large project`. Why are they in such jobs ? Incompetent.
They did, they just didn't take into account stuff like if we cross over this railway we might need to accommodate it being doubled in the near future.
HS2 Ltd also refused to hire the guy who was in charge of HS1 because he wanted the messaging to be all about capacity (because that's the point) instead of speed which the DfT and HS2 Ltd didn't like.
I guarantee that if they had just gone with a 200mph railway in the first place the costs would have been way down but the government wanted the "fastest conventional railway in the world".
So it looks like they spent £1.5m on buying a house on the 2nd, that's £1.5m they wasted so Sunak could announce a decision he had clearly made ages ago at the conference.
Absolute pisstake, Sunak has enough money he should pay that himself.
People who were forced to sell their homes can now buy them back - at an inflated price: https://inews.co.uk/news/hs2-evictees-to...ce-2668944
Would rather talk to ChatGPT
Posts: 11,922
Threads: 798
Joined: Oct 2022
Reputation:
50
10-07-2023, 08:43 PM
(This post was last modified: 10-07-2023, 08:44 PM by CarlosCorbewrong.)
Now, this is what I'm talking about - action!
Rishi promised the money to extend Nottingham's tram system just two days ago and its been built already! https://www.bbc.com/news/uk-england-nott...018930.amp
Would rather talk to ChatGPT
Posts: 11,311
Threads: 419
Joined: Feb 2020
Reputation:
18
Not like his speech was cobbled together in five minutes is it? No, not at all.
Posts: 11,922
Threads: 798
Joined: Oct 2022
Reputation:
50
(10-07-2023, 09:10 PM)Protheroe Wrote: Not like his speech was cobbled together in five minutes is it? No, not at all.
Given that literally everyone knew it was getting cancelled days before, it would seem, Rishi did, maybe some staffers should have helped him write his speech.
Would rather talk to ChatGPT
Posts: 11,311
Threads: 419
Joined: Feb 2020
Reputation:
18
It now transpires that Rishi rejected a private sector led plan to build HS2’s Euston terminus in 2020.
|