Posts: 19,492
Threads: 824
Joined: Jan 2019
Reputation:
60
It’s taken me 5 hours to drive back from Gatwick to Brum after landing at 10pm...
M23 shut
Part of M25 shut and 4 lanes merged into a slip road with traffic lights - backed up for an hour at 1am
M25/40 slip road closed so had to go through back roads to Beaconsfield services
J14-12 of M40 shut so had to go round Gaydon
j3 of m42 closed so had to go up through Solihull
How is anyone supposed to get anywhere?!
Posts: 4,217
Threads: 169
Joined: Jan 2019
Sorry about the jn3 of the m42 that was my job but if you was going southbound from the m40 going towards the m5 the jn3 on the m42 was open going towards redditch etc the n/b entry slip was closed if you was going towards Beckett's farm towards the maypole .
Posts: 440
Threads: 45
Joined: Jun 2019
Posts: 3,733
Threads: 116
Joined: Jan 2019
Reputation:
14
I drove all the way to Catalonia and back last summer. I swear to God, from Calais to Roses and back I didn't have a single traffic problem. Getting down to Dover took longer than expected but the journey back from Dover was utterly shite with delays on M20 and M25 and a closure on M40. The transport network in this country is dire and desperately needs investment.
Posts: 4,217
Threads: 169
Joined: Jan 2019
Posts: 4,217
Threads: 169
Joined: Jan 2019
Ossian there has to be major construction on the roads mainly due to tarmac etc with more hgvs etc and modernising the smart motorway network which personally are dangerous using all lanes running there is no where to go if you breakdown .....if you think the oldbury viaduct was bad you wait until jn10 is being done early next year when jn2/1 is finished ....major delays everywhere