Following on from the HS2line that will connect London to Birmingham Solihull in 45 minutes, today’s farce is digging up Corporation Street to replace the tram track that is, what, 4 years old? https://www.birminghammail.co.uk/news/mi...s-21151273
Posts: 1,036
Threads: 23
Joined: Jan 2019
I suppose the alternative was to go without any tram tracks at all for 4 years
Posts: 13,407
Threads: 402
Joined: Jul 2019
Reputation:
14
You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Posts: 13,573
Threads: 492
Joined: Jan 2019
Reputation:
40
(07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
Posts: 3,075
Threads: 116
Joined: Jan 2019
Reputation:
11
(07-27-2021, 12:20 PM)Borin' Baggie Wrote: build it in the air (Simpsons monorail style) or build it underground.
Any excuse...
The monorail is still out of control. Marge communicates to Homer.
Marge: Homer! There's someone here who says he can help you.
Homer: Batman?!
Marge: No, he's a scientist.
Homer: Batman's a scientist!
Marge: It's not Batman!
Posts: 13,407
Threads: 402
Joined: Jul 2019
Reputation:
14
(07-27-2021, 12:20 PM)Borin' Baggie Wrote: (07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
I was more on about inventing an easy system for replacements. Seems like they're doing the job twice, only the second time is considerably faster, so did they rip us off the first time round?
Posts: 7,412
Threads: 124
Joined: Jan 2019
Reputation:
11
07-27-2021, 03:32 PM
(This post was last modified: 07-27-2021, 03:32 PM by Psalm23.)
I shouldn't worry about it too much, they'll probably be digging it up again next year to replace the gas, or water mains, judging by previous escapades.
Posts: 13,573
Threads: 492
Joined: Jan 2019
Reputation:
40
(07-27-2021, 03:26 PM)MassDebater Wrote: (07-27-2021, 12:20 PM)Borin' Baggie Wrote: (07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
I was more on about inventing an easy system for replacements. Seems like they're doing the job twice, only the second time is considerably faster, so did they rip us off the first time round?
That's my point though, as the track-bed needs to be underneath the road there isn't an easy system for replacements and any effort to invent one would cost billions.
As for why they're doing it, fuck knows. Given that it's a public project with public bodies delivering it maybe they were unable to see more than 5 minutes into the future and they didn't think to plan for accommodating for the second line that they planned for within the initial scope.
Posts: 1,324
Threads: 117
Joined: Dec 2020
(07-27-2021, 12:20 PM)Borin' Baggie Wrote: (07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
Actually, in layman’s terms, the best solution would have been to stop for a minute and go “what does this need to do in 5 years time?” and build it for that instead of the current day. The same could be said for a lot of HS2 I’m told. Out of date before it gets running.
Posts: 13,407
Threads: 402
Joined: Jul 2019
Reputation:
14
(07-27-2021, 03:37 PM)DJPunkRoc Wrote: (07-27-2021, 12:20 PM)Borin' Baggie Wrote: (07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
Actually, in layman’s terms, the best solution would have been to stop for a minute and go “what does this need to do in 5 years time?” and build it for that instead of the current day. The same could be said for a lot of HS2 I’m told. Out of date before it gets running.
Fair points, local governments, they do love spunking, maybe they run Vile? Think they work on assuming they won't be in power when it needs replacing.
With the inventing thing, I'm just surprised there's not like a slot in / slot out type rail system that would just need bolting into the road, like dig a hole x inches deep, slide in the track and bolt into place... to replace unbolt and take out and slot a new one in. A bit like replacing one broken slab, instead of digging the whole path up...I don't get the it being under the road thing. Then again I have zero knowledge of how it is / needs to be, but they don't dig up miles of train track to replace bits, or do they?
|