(09-15-2023, 12:37 PM)TETLEY74 Wrote: (09-15-2023, 09:07 AM)Protheroe Wrote: (09-15-2023, 08:00 AM)Ted Maul Wrote: Best argument going for HS2 is that the WCML needs the capacity, that is all.
Given it finishes at Honour Oak and you have to change trains from Curzon Street to get anywhere useful in the West Midlands, it's not exactly much quicker.
If Birmingham City Council (and others) hadn't insisted on refurbing New Street station then the mainline station would already be at Curzon Street. It's an incredible lack of foresight.
Complete and utter waste of money it will be outdated even before the first train runs on the tracks. If they need extra capacity then re opening some of the dissused old goods lines would have been cheaper and quicker ,,,,then again all big projects in this country run way over budget and take far longer to complete than they should so maybe not.
They already did that with the Chiltern Mainline, it didn't relieve enough capacity.
The only two solutions were HS2 or four-tracking the southern WCML approach into New Street (ideally both). But the latter is still a multi billion pound project and it's far more disruptive.
The cost issue is because of the DfT and Treasury being fucking useless as well as chronic short-termism on government spending, I spoke with a tunnelling engineer and they estimated we're close to hitting what fully tunnelling HS2 would cost which is stupid.
Posts: 17,089
Threads: 614
Joined: Jan 2019
Reputation:
115
With online meetings and the hassle that is getting around city centres, why are we building ‘capacity’ for trips most of us don’t need to go on more than a handful of times if any a year?
Think of the good the billions spent could have done across the country.
Posts: 13,579
Threads: 492
Joined: Jan 2019
Reputation:
40
(09-15-2023, 01:01 PM)Derek Hardballs Wrote: With online meetings and the hassle that is getting around city centres, why are we building ‘capacity’ for trips most of us don’t need to go on more than a handful of times if any a year?
Think of the good the billions spent could have done across the country.
Rail passenger usage is already above pre-Covid levels. That is despite continued disruption from strikes and some operators like Avanti still using Covid timetables. What's happened is there's less people on peak time trains and more people travelling off-peak - but the overall passenger numbers are up 3% on the previous usage peak in February 2020.
Also, rail freight capacity.
Posts: 11,320
Threads: 420
Joined: Feb 2020
Reputation:
18
(09-15-2023, 12:35 PM)Borin' Baggie Wrote: That's what the current status quo is though?
I'm not really sure what you're arguing, I thought you were arguing for transferring services from New Street to Curzon Street.
WCML with limited stops and HS2 to Curzon Street. Cross Country remains at New Street.
Posts: 13,579
Threads: 492
Joined: Jan 2019
Reputation:
40
(09-15-2023, 01:25 PM)Protheroe Wrote: (09-15-2023, 12:35 PM)Borin' Baggie Wrote: That's what the current status quo is though?
I'm not really sure what you're arguing, I thought you were arguing for transferring services from New Street to Curzon Street.
WCML with limited stops and HS2 to Curzon Street. Cross Country remains at New Street.
But that wouldn't work because Birmingham New Street itself is on the WCML, the WCML needs a northern exit to allow for trains to use the Oxley depot (which is why the late evening trains from Euston to the Midlands terminate at Wolverhampton and not New Street) and you would need a path for northbound services (both LNWR and Avanti go northbound) as well as a redundant connection to the line via Castle Bromwich.
That's why the Victorians abandoned Curzon Street so quickly, it didn't logistically make any sense due to various constraints with its orientation. It only works as a terminus for Birmingham to London services, and the WCML carries on through Birmingham New Street.
The only way to facilitate that is to build those platforms underground and then connect them to New Street anyway, which is expensive and you're still using New Street. So what's the point? You could build an underground tunnel to bypass the station and connect onto the WCML west of New Street but signalling that is a pain, not to mention building it adds on extra cost (BCC couldn't even get an underground light rail network through, how were they supposed to get money for that?)
Posts: 11,320
Threads: 420
Joined: Feb 2020
Reputation:
18
(09-15-2023, 01:39 PM)Borin' Baggie Wrote: (09-15-2023, 01:25 PM)Protheroe Wrote: (09-15-2023, 12:35 PM)Borin' Baggie Wrote: That's what the current status quo is though?
I'm not really sure what you're arguing, I thought you were arguing for transferring services from New Street to Curzon Street.
WCML with limited stops and HS2 to Curzon Street. Cross Country remains at New Street.
But that wouldn't work because Birmingham New Street itself is on the WCML, the WCML needs a northern exit to allow for trains to use the Oxley depot (which is why the late evening trains from Euston to the Midlands terminate at Wolverhampton and not New Street) and you would need a path for northbound services (both LNWR and Avanti go northbound) as well as a redundant connection to the line via Castle Bromwich.
That's why the Victorians abandoned Curzon Street so quickly, it didn't logistically make any sense due to various constraints with its orientation. It only works as a terminus for Birmingham to London services, and the WCML carries on through Birmingham New Street.
The only way to facilitate that is to build those platforms underground and then connect them to New Street anyway, which is expensive and you're still using New Street. So what's the point? You could build an underground tunnel to bypass the station and connect onto the WCML west of New Street but signalling that is a pain, not to mention building it adds on extra cost (BCC couldn't even get an underground light rail network through, how were they supposed to get money for that?)
You're dealing with the here and now, I'm lamenting what should have happened prior to the redevelopment of New Street. There were exceptionally serious discussions about a new "Grand Central" at Curzon Street. This is now 25 years ago. We're stuck with what we have now largely because of a lack of political will and typical Brummie parochialism about New Street then.
Further back I was still a teenager when Brummie politicians were killing off the most useful proposed Metro line from the City to the NEC serving the train starved east of Birmingham.
Our record on infrastructure here has been cheap and lazy for generations.
Posts: 13,579
Threads: 492
Joined: Jan 2019
Reputation:
40
(09-15-2023, 02:06 PM)Protheroe Wrote: (09-15-2023, 01:39 PM)Borin' Baggie Wrote: But that wouldn't work because Birmingham New Street itself is on the WCML, the WCML needs a northern exit to allow for trains to use the Oxley depot (which is why the late evening trains from Euston to the Midlands terminate at Wolverhampton and not New Street) and you would need a path for northbound services (both LNWR and Avanti go northbound) as well as a redundant connection to the line via Castle Bromwich.
That's why the Victorians abandoned Curzon Street so quickly, it didn't logistically make any sense due to various constraints with its orientation. It only works as a terminus for Birmingham to London services, and the WCML carries on through Birmingham New Street.
The only way to facilitate that is to build those platforms underground and then connect them to New Street anyway, which is expensive and you're still using New Street. So what's the point? You could build an underground tunnel to bypass the station and connect onto the WCML west of New Street but signalling that is a pain, not to mention building it adds on extra cost (BCC couldn't even get an underground light rail network through, how were they supposed to get money for that?)
You're dealing with the here and now, I'm lamenting what should have happened prior to the redevelopment of New Street. There were exceptionally serious discussions about a new "Grand Central" at Curzon Street. This is now 25 years ago. We're stuck with what we have now largely because of a lack of political will and typical Brummie parochialism about New Street then.
Further back I was still a teenager when Brummie politicians were killing off the most useful proposed Metro line from the City to the NEC serving the train starved east of Birmingham.
Our record on infrastructure here has been cheap and lazy for generations.
That situation was the same 25 years ago as it is today, as it was in 1950, as it was in 1900. It's been locked in since 1854 when the Victorians decided to build New Street and divert LNWR (the original LNWR) services from Curzon Street to New Street. To make Curzon Street a viable station for WCML traffic you would have still needed to either build underground platforms and then connect those platforms with New Street in the late 1990s, and realistically you would need to replicate Oxley Depot (but still keep the Oxley depot) near the NEC. It is prohibitively expensive for basically zero benefit. Curzon Street can only ever operate as a terminus for London services, WCML trains into Birmingham can't have a terminus which is why the Victorians abandoned the idea. If you want to know what the alternative to New Street is, look at the broken mess that is Manchester (which is also why the original HS2 plans involved tunnelling under Piccadilly - to avoid the mistakes of having Piccadilly as a terminus - but British infrastructure planning has scuppered that even if Phase 2b gets built).
RE: The "metro" line, that is a fault of BR and then Railtrack rather than Birmingham City Council. There is no scope to run a parallel service along the WCML approach to International without four-tracking the line, and that has never been within the scope of BCC. To break down the history of who's scope it fell under: first it was LMS who originally planned and started work on it (which is why there are abandoned sidings at Stechford), then Hitler happened so it was stopped. BR then abandoned the works postwar, then Railtrack decided to not include it in the WCML works programme they screwed up, then Centro/MMA/TfWM could have replicated it but they would have had to ask the Treasury and DfT permission which was low priority as there was already a connection, and lets be honest the Treasury and DfT have screwed over the tram works in Birmingham massively (piecemeal upgrade programme instead of single scope, blocking the underground metro connection from Snow Hill to New Street/Centenary Square/ Moor Street/Hagley Road) so why trust that was ever going to happen. Now it's within TfWM's purview but let's be honest it's still very low priority. And I do want the four-tracking between Berkswell and New Street as not only would that enable a shuttle service every 10 minutes between Coventry and New Street that stops at every station but it would also enable 4 fast trains per hour between New Street and Euston. And, the thing is, these plans are 90 years old now and haven't been acted on and won't be acted on.
Further, I know for a fact that BCC and the people who redeveloped the Bull Ring specifically asked Railtrack to widen the approach tunnel to accommodate 6 tracks instead of 4, and Railtrack said no. That's not BCC's fault, that's Railtrack.
The only practical way to improve capacity at New Street is to build the Bordesley Chords and divert southbound local services from New Street into Moor Street, but Network Rail/DfT are being arsey about doing that as per the usual.
Posts: 3,733
Threads: 116
Joined: Jan 2019
Reputation:
14
What rankles most is the hefty compo the Seals got just because it cut across a far corner of their Bodymoor Heath complex.
Posts: 11,320
Threads: 420
Joined: Feb 2020
Reputation:
18
(09-15-2023, 02:34 PM)Borin' Baggie Wrote: (09-15-2023, 02:06 PM)Protheroe Wrote: (09-15-2023, 01:39 PM)Borin' Baggie Wrote: But that wouldn't work because Birmingham New Street itself is on the WCML, the WCML needs a northern exit to allow for trains to use the Oxley depot (which is why the late evening trains from Euston to the Midlands terminate at Wolverhampton and not New Street) and you would need a path for northbound services (both LNWR and Avanti go northbound) as well as a redundant connection to the line via Castle Bromwich.
That's why the Victorians abandoned Curzon Street so quickly, it didn't logistically make any sense due to various constraints with its orientation. It only works as a terminus for Birmingham to London services, and the WCML carries on through Birmingham New Street.
The only way to facilitate that is to build those platforms underground and then connect them to New Street anyway, which is expensive and you're still using New Street. So what's the point? You could build an underground tunnel to bypass the station and connect onto the WCML west of New Street but signalling that is a pain, not to mention building it adds on extra cost (BCC couldn't even get an underground light rail network through, how were they supposed to get money for that?)
You're dealing with the here and now, I'm lamenting what should have happened prior to the redevelopment of New Street. There were exceptionally serious discussions about a new "Grand Central" at Curzon Street. This is now 25 years ago. We're stuck with what we have now largely because of a lack of political will and typical Brummie parochialism about New Street then.
Further back I was still a teenager when Brummie politicians were killing off the most useful proposed Metro line from the City to the NEC serving the train starved east of Birmingham.
Our record on infrastructure here has been cheap and lazy for generations.
That situation was the same 25 years ago as it is today, as it was in 1950, as it was in 1900. It's been locked in since 1854 when the Victorians decided to build New Street and divert LNWR (the original LNWR) services from Curzon Street to New Street. To make Curzon Street a viable station for WCML traffic you would have still needed to either build underground platforms and then connect those platforms with New Street in the late 1990s, and realistically you would need to replicate Oxley Depot (but still keep the Oxley depot) near the NEC. It is prohibitively expensive for basically zero benefit. Curzon Street can only ever operate as a terminus for London services, WCML trains into Birmingham can't have a terminus which is why the Victorians abandoned the idea. If you want to know what the alternative to New Street is, look at the broken mess that is Manchester (which is also why the original HS2 plans involved tunnelling under Piccadilly - to avoid the mistakes of having Piccadilly as a terminus - but British infrastructure planning has scuppered that even if Phase 2b gets built).
RE: The "metro" line, that is a fault of BR and then Railtrack rather than Birmingham City Council. There is no scope to run a parallel service along the WCML approach to International without four-tracking the line, and that has never been within the scope of BCC. To break down the history of who's scope it fell under: first it was LMS who originally planned and started work on it (which is why there are abandoned sidings at Stechford), then Hitler happened so it was stopped. BR then abandoned the works postwar, then Railtrack decided to not include it in the WCML works programme they screwed up, then Centro/MMA/TfWM could have replicated it but they would have had to ask the Treasury and DfT permission which was low priority as there was already a connection, and lets be honest the Treasury and DfT have screwed over the tram works in Birmingham massively (piecemeal upgrade programme instead of single scope, blocking the underground metro connection from Snow Hill to New Street/Centenary Square/ Moor Street/Hagley Road) so why trust that was ever going to happen. Now it's within TfWM's purview but let's be honest it's still very low priority. And I do want the four-tracking between Berkswell and New Street as not only would that enable a shuttle service every 10 minutes between Coventry and New Street that stops at every station but it would also enable 4 fast trains per hour between New Street and Euston. And, the thing is, these plans are 90 years old now and haven't been acted on and won't be acted on.
Further, I know for a fact that BCC and the people who redeveloped the Bull Ring specifically asked Railtrack to widen the approach tunnel to accommodate 6 tracks instead of 4, and Railtrack said no. That's not BCC's fault, that's Railtrack.
The only practical way to improve capacity at New Street is to build the Bordesley Chords and divert southbound local services from New Street into Moor Street, but Network Rail/DfT are being arsey about doing that as per the usual.
I understand you're always very sure of yourself, but there was a serious conversation about a "Grand Central" at Curzon Street (or deeper into Nechells) when I was still working at the City 25 years ago - by people far more qualified than you or I in rail engineering.
As for the Metro Line through East Birmingham. This was intended to be the FIRST route - running to the NEC via the still under-served East Birmingham suburbs of Nechells, Saltley, Washwood Heath, Ward End, Hodge Hill, then leaving the city, reaching the NEC via Castle Bromwich and Chelmsley Wood. It was never intended to go down the railway line at all - it was going (broadly) down the (old) A47. It seems to be a peculiarly Midlands thing to stick rapid transit into old railway cuttings. My memory of 1984 is probably better than yours, and this sticks in my mind as it was planned to go virtually past my front door.
Posts: 13,579
Threads: 492
Joined: Jan 2019
Reputation:
40
09-15-2023, 05:07 PM
(This post was last modified: 09-15-2023, 05:42 PM by Borin' Baggie.)
I am relaying discussions about Curzon Street, from railway engineers involved with Network Rail and the DfT as well as Civil Engineers at BBV on the approach into Curzon Street from when I worked with HS2 in my first job after my first degree and before I started my masters. There were still discussions about diverting WCML services into Curzon Street by non-technical DfT civil servants as suggestions to relieve congestion at New Street back then and they were dismissed for those reasons (they were still revising the 2012 initial service schedule back then, it's also how I know about the stupid DfT plan to not use the released capacity from Phase 2a by moving services starting at New Street via Crewe at Crewe), because it is extremely cost prohibitive and a massive works that doesn't account for depots and the available infrastructure constraints. Hence why I keep bringing up why the Victorians moved LNWR services to New Street from Curzon Street in the first place, Curzon Street was designed specifically to only ever operate as a terminus. I've pointed out the infrastructure constraints, those constraints are well over a century in the making and were the same in the late 1990s as they are today. It doesn't matter if those were "serious", BCC couldn't even get funding for an underground connection from Snow Hill to New Street so how were they supposed to get funding for the amount of works it would have taken to divert WCML trains to Curzon Street?
I can also talk about the mess at Euston with the DfT and Treasury fucking up (and still fucking up), or the now scrapped HS2 Heathrow Hub, both pissing off Aurp if you want. Or HS2 Ltd forgetting that they needed to account for tracks that HS2 crosses over potentially being doubled in the next 50 years in their design.
They are still planning on an East Birmingham Metro, as well as building new stations at Castle Brom and Fort Dunlop on the line into Water Orton - they're waiting on capacity gains at New Street to enable that. They are still planning on a seperate metro line connecting east Brum with Chelmsley Wood, the airport/NEC and Solihull - it's only been a few months since the devolved transport authority for the Midlands has been able to plan out anything other than piecemeal proposals and the funding granted to that section up to Digbeth High Street. They are even still planning on the extension from Five Ways to Quinton and Halesowen as per my mate who works with the MMA. It's kind of difficult to plan out something like the Elizabeth Line when you're not allowed to. Even your 1984 proposals were to run underground under the city centre and the revised 1988 proposals were mothballed by Centro because the bid structure for piecemeal updates with permission from the Treasury and DfT were frustrating it. The Dudley extension they're doing now was planned to be completed by 1993 originally.
And conversion of old railway alignments is hardly a Midlands thing: Merseyrail, Tyne & Wear Metro, Manchester Metrolink, Croydon Tramway, Nottingham Express Transit - they all use old heavy rail alignments. Birmingham's problem was them wanting to go underground at Snow Hill (hence where the old tram platforms were located) but funding was blocked by central government so they had to go back to the drawing board and plan out and above-ground route and then apply for funding for that.
|