The cost of NIMBYism and obstructive planning in the energy sector
#28
(12-06-2024, 01:46 PM)Protheroe Wrote: Doesn't appear particularly joined up to me BB.

The logic is that when the wind farms are not able to run at full capacity due to low wind speeds then we will be able to service the electricity being generated. If you have a 500MW wind farm but capacity constraints mean you can only transfer 250MW of it to the grid, then you can run the full wind farm when speeds are half of what it's rated and therefore still output 250MW of power.

It's the same as running nuclear reactors or gas turbines at reduced capacity due to troughs in demand.
Reply


Messages In This Thread
RE: The cost of NIMBYism and obstructive planning in the energy sector - by Borin' Baggie - 12-06-2024, 08:44 PM