The cost of NIMBYism and obstructive planning in the energy sector
#17
(12-05-2024, 08:43 PM)Protheroe Wrote:
(12-05-2024, 08:33 PM)Borin' Baggie Wrote: When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.

Quite. I only worked in commercial development for 15 years BB, and even I know it could take 3 months for Western Power to do the regulated 12" joint between my substation and the warehouse I'd just built - let alone building swathes of pylons across the countryside.

Who on Earth was advising ministers to sign these cretinous deals? Who are "they"?

It took 3 years to build the IFA-2 and 4 years to get it to full flow - that is a 200km HVDC subsea cable. It should not take 15 years to build extra capacity and redundancy along high traffic corridors above ground to help balance national and European demand. That is the problem.

Ultimately, those CfDs would be perfectly reasonable if they would build the sodding grid infrastructure instead of placating NIMBYs. Those wind farms getting built are crucial for the UK being a net energy exporter in 6 years but we won't be able to export the electricity if we can't get the power to the interconnectors.