01-29-2023, 06:55 PM
(01-29-2023, 06:34 PM)Tom Joad Wrote: I take BurleyBaggie's point -particularly about capacity- but still have hefty misgivings over HS2. Firstly, the much vaunted "slashed" journey time shaves off a mere 10 minutes over the current speed, but it does drop you off 10 minutes from Brum City Centre. Next, the cost and under use of HS1 doesnt appear to have been considered before commiting to this huge spend up. Also, By hurtling between London, Brum and Manchester, it is catering for less people, surely a train stopping at all stations between would be more inclusive. Then again, inclusivity is hardly a government concern. The cynical side of me thinks it is all about getting people to London. I really think we need more East to West lines and much less focus on London and the SE.
Birmingham-Central London drops from 1 hour 24 minutes to 48 minutes, that's more than 10 minutes. Also the tram is supposed to operate to link Curzon Street to Corporation Street if you don't want to walk 10 minutes. As grand as it would be to expand New Street 7 more underground platforms would cost billions more than using Curzon Street as well as add delays.
As for the catering for more people issue, the more intercity routes that can be moved onto HS2 the more capacity is freed up at existing stations e.g. one fewer WCML intercity service per hour into New Street enables two additional hourly cross city line services up to 6 trains per hour, two additional trains per hour between Birmingham and Leicester, an additional train per hour from Birmingham to Hereford and an additional train per hour from Birmingham to Hereford. On top of that, more freight services can go through Coventry station going between Southampton and Immingham.
There was also supposed to be the addressing the problem between Sheffield-Leeds and East Mids-Birmingham services but that's been scaled back by a lack of foresight in cutting the Eastern Leg.

