07-27-2021, 03:26 PM
(07-27-2021, 12:20 PM)Borin' Baggie Wrote:(07-27-2021, 11:49 AM)MassDebater Wrote: You'd have hoped that the track layers would've planned ahead for the necessity and made it so that tracks could be taken up and replaced modularly, without needing to wreck the road, again.... but hey, that would earn them less and cause less disruption...
Not really practical as the track-bed is under the road, and you need a road there for pedestrians, cars, buses and goods vehicles. Where the tram is rapid-transit, e.g. between St Chads and The Hawthorns, the track bed is exposed and maintenance is easy. So you'd need a modular road which, as far as I'm aware, doesn't exist. There's some pictures in this guidance document that show the extent of the issue.
The best solution for this is to make as much of the tram rapid-transit as possible but that is incredibly difficult for a built up area as you either need to knock down loads of buildings, permanently close off roads, build it in the air (Simpsons monorail style) or build it underground.
I was more on about inventing an easy system for replacements. Seems like they're doing the job twice, only the second time is considerably faster, so did they rip us off the first time round?