09-23-2020, 11:03 PM
Used to be my line of work adopting roads for a LA. Basically how quickly it happens boils down to how co-operative the developer has been with the LA from the beginning. All developers will have (or should have) a copy of the relevant LA's development guide, which amongst other things will spell out what is expected in terms of the carriageway and footway construction, street lighting requirements, drainage etc. There will also be guides with regards to laying services (gas, elec etc). Throughout the construction it is the responsibility of the developer to have the roads inspected/construction supervised by the LA and signed off. If all is well at the end the road will be adopted. If the developer does not co-operate from the start then problems can arise. After all, a developer is trying to build as many houses as it can as quickly as possible, sell them and move on having made a big fat profit. Road building eats into that profit, and believe me some developers (reputable ones at that) will pull all manner of stunts to shave a few quid off their costs. Bottom line is if its done right it will get adopted. If it aint it could take years. After all, why should a LA take on a badly built road that that they know will need repairing in short order, at the taxpayers expense?