RE: Latest Midlands transport farce - Borin' Baggie - 07-27-2021

Yeah, that would be great. But that requires foresight that is "outside the scope" and would introduce "added costs" (even if it costs less in the long term) so it's much easier to waste more money later and inconvenience people instead of just planning ahead.


RE: Latest Midlands transport farce - TETLEY74 - 07-27-2021

(07-27-2021, 03:45 PM)Borin' Baggie Wrote: Yeah, that would be great. But that requires foresight that is "outside the scope" and would introduce "added costs" (even if it costs less in the long term) so it's much easier to waste more money later and inconvenience people instead of just planning ahead.

The other problem is they'd waste at least another  5-10yrs planning the bloody thing by which time it would be out of date and way over budget!!


RE: Latest Midlands transport farce - Borin' Baggie - 07-27-2021

(07-27-2021, 03:43 PM)MassDebater Wrote: Fair points, local governments, they do love spunking, maybe they run Vile? Think they work on assuming they won't be in power when it needs replacing.

With the inventing thing, I'm just surprised there's not like a slot in / slot out type rail system that would just need bolting into the road, like dig a hole x inches deep, slide in the track and bolt into place... to replace unbolt and take out and slot a new one in. A bit like replacing one broken slab, instead of digging the whole path up...I don't get the it being under the road thing. Then again I have zero knowledge of how it is / needs to be, but they don't dig up miles of train track to replace bits, or do they?

With respect to the rails, the track bed has to be underneath the road surface. I'm unsure of the specifics as I'm not a civil engineer but I do know that there's no easy way to have a road that is easy to replace and is substantial enough to support cars. So to get at the rails they don't have a choice other than to dig up the road. On the bit of the tram network where there's no need to dig up the roads (like the section that goes past The Hawthorns) it's a lot more straightforward and you can not only assess damage to the trackbed via a visual inspection but you can also easily access the bit that needs replacing.

(07-27-2021, 04:45 PM)TETLEY74 Wrote:
(07-27-2021, 03:45 PM)Borin' Baggie Wrote: Yeah, that would be great. But that requires foresight that is "outside the scope" and would introduce "added costs" (even if it costs less in the long term) so it's much easier to waste more money later and inconvenience people instead of just planning ahead.

The other problem is they'd waste at least another  5-10yrs planning the bloody thing by which time it would be out of date and way over budget!!

You'd be surprised, I guarantee you that the engineers planned out how to integrate the Eastside expansion with the current line when the extension into the city centre was first developed but politics just got in the way. Hell, the route for the loop that links Stourbridge to the Dudley and Edgbaston expansions and the expansion eastwards from Digbeth to Solihull have all be mapped out and modelled but as they haven't got any funding for it and they have to remain within the planned scope they're hands are tied on what they can actually do. And it's not like the delays are already dumb, HS2 should have been signed off by Maggie Thatcher and the Birmingham and Black Country tram network by Clement Attlee.