WBAUnofficial
The cost of NIMBYism and obstructive planning in the energy sector - Printable Version

+- WBAUnofficial (https://wbaunofficial.org.uk)
+-- Forum: WBAUnofficial (https://wbaunofficial.org.uk/forumdisplay.php?fid=3)
+--- Forum: Politics (https://wbaunofficial.org.uk/forumdisplay.php?fid=5)
+--- Thread: The cost of NIMBYism and obstructive planning in the energy sector (/showthread.php?tid=35835)

Pages: 1 2 3 4 5 6 7 8 9 10


RE: The cost of NIMBYism and obstructive planning in the energy sector - Borin' Baggie - 12-05-2024

(12-05-2024, 06:55 PM)Kit Kat Chunky Wrote:
(12-05-2024, 06:47 PM)Borin' Baggie Wrote:
(12-05-2024, 06:09 PM)Protheroe Wrote:
(12-05-2024, 04:34 PM)Borin' Baggie Wrote: Labour have signalled that they want to streamline planning and get key energy transmission infrastructure built quicker (obviously dependent on the skilled labour being there to build it which is the other side of the problem) but the Tory councils on the coast are threatening legal action because pylons will spoil the view.

So Labour are being generally reasonable on the planning side, they've also taken the ESO back into public ownership in an attempt to clear a lot of red tape on the planning side.

I can't help thinking it might have been a good idea to have got the transmission infrastructure built in time to service the new generation capacity.

When it takes a couple of years to build an offshore wind farm and 15 years to facilitate a connection upgrade to enable said wind farm to operate fully 24/7/365, what exactly are you supposed to do for 13 years?

Don't build it in the first place and invest in your existing Nuclear Electric technology

Our current nuclear infrastructure is eol, the cost of maintenance will shoot up massively soon, new nuclear takes even longer to get online while having serious issues with securing funding from the public purse and private sector, and SMR is at least a decade away and the jury is out on the economics of that owing to small reactors not being anywhere near as efficient to run than larger reactors. I'm all for nuclear but that isn't a fix to this, is it?

Also, at the time of this comment at peak draw wind is currently accounting for 45% of electricity generation in the UK. That's an awful lot of power "not to build in the first place", compounded by the fact that the issue in the article relates to wind generating too much power for the grid to cope.

What we need to do is stop fucking about, streamline planning for grid infrastructure, tell the Green Party and Tory Party to go suck a lemon, relax immigration restrictions so we can make up the qualified labour shortages in the energy sector - particularly in connections and distribution - and invest a shit tonne of money into training.


RE: The cost of NIMBYism and obstructive planning in the energy sector - Kit Kat Chunky - 12-05-2024

Pity Starmer didn't say that in his Manifesto. Instead we get rinse and repeat


RE: The cost of NIMBYism and obstructive planning in the energy sector - Protheroe - 12-05-2024

(12-05-2024, 06:47 PM)Borin' Baggie Wrote:
(12-05-2024, 06:09 PM)Protheroe Wrote:
(12-05-2024, 04:34 PM)Borin' Baggie Wrote: Labour have signalled that they want to streamline planning and get key energy transmission infrastructure built quicker (obviously dependent on the skilled labour being there to build it which is the other side of the problem) but the Tory councils on the coast are threatening legal action because pylons will spoil the view.

So Labour are being generally reasonable on the planning side, they've also taken the ESO back into public ownership in an attempt to clear a lot of red tape on the planning side.

I can't help thinking it might have been a good idea to have got the transmission infrastructure built in time to service the new generation capacity.

When it takes a couple of years to build an offshore wind farm and 15 years to facilitate a connection upgrade to enable said wind farm to operate fully 24/7/365, what exactly are you supposed to do for 13 years?

Well, not contract to pay £billions to stop wind farms generating useless electricity would be a start.


RE: The cost of NIMBYism and obstructive planning in the energy sector - Borin' Baggie - 12-05-2024

(12-05-2024, 08:16 PM)Protheroe Wrote:
(12-05-2024, 06:47 PM)Borin' Baggie Wrote:
(12-05-2024, 06:09 PM)Protheroe Wrote:
(12-05-2024, 04:34 PM)Borin' Baggie Wrote: Labour have signalled that they want to streamline planning and get key energy transmission infrastructure built quicker (obviously dependent on the skilled labour being there to build it which is the other side of the problem) but the Tory councils on the coast are threatening legal action because pylons will spoil the view.

So Labour are being generally reasonable on the planning side, they've also taken the ESO back into public ownership in an attempt to clear a lot of red tape on the planning side.

I can't help thinking it might have been a good idea to have got the transmission infrastructure built in time to service the new generation capacity.

When it takes a couple of years to build an offshore wind farm and 15 years to facilitate a connection upgrade to enable said wind farm to operate fully 24/7/365, what exactly are you supposed to do for 13 years?

Well, not contract to pay £billions to stop wind farms generating useless electricity would be a start.

When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.


RE: The cost of NIMBYism and obstructive planning in the energy sector - Kit Kat Chunky - 12-05-2024

(12-05-2024, 08:33 PM)Borin' Baggie Wrote:
(12-05-2024, 08:16 PM)Protheroe Wrote:
(12-05-2024, 06:47 PM)Borin' Baggie Wrote:
(12-05-2024, 06:09 PM)Protheroe Wrote:
(12-05-2024, 04:34 PM)Borin' Baggie Wrote: Labour have signalled that they want to streamline planning and get key energy transmission infrastructure built quicker (obviously dependent on the skilled labour being there to build it which is the other side of the problem) but the Tory councils on the coast are threatening legal action because pylons will spoil the view.

So Labour are being generally reasonable on the planning side, they've also taken the ESO back into public ownership in an attempt to clear a lot of red tape on the planning side.

I can't help thinking it might have been a good idea to have got the transmission infrastructure built in time to service the new generation capacity.

When it takes a couple of years to build an offshore wind farm and 15 years to facilitate a connection upgrade to enable said wind farm to operate fully 24/7/365, what exactly are you supposed to do for 13 years?

Well, not contract to pay £billions to stop wind farms generating useless electricity would be a start.

When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.
Oh that's ok then. Not Labour's fault


RE: The cost of NIMBYism and obstructive planning in the energy sector - Protheroe - 12-05-2024

(12-05-2024, 08:33 PM)Borin' Baggie Wrote: When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.

Quite. I only worked in commercial development for 15 years BB, and even I know it could take 3 months for Western Power to do the regulated 12" joint between my substation and the warehouse I'd just built - let alone building swathes of pylons across the countryside.

Who on Earth was advising ministers to sign these cretinous deals? Who are "they"?


RE: The cost of NIMBYism and obstructive planning in the energy sector - Borin' Baggie - 12-05-2024

(12-05-2024, 08:43 PM)Protheroe Wrote:
(12-05-2024, 08:33 PM)Borin' Baggie Wrote: When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.

Quite. I only worked in commercial development for 15 years BB, and even I know it could take 3 months for Western Power to do the regulated 12" joint between my substation and the warehouse I'd just built - let alone building swathes of pylons across the countryside.

Who on Earth was advising ministers to sign these cretinous deals? Who are "they"?

It took 3 years to build the IFA-2 and 4 years to get it to full flow - that is a 200km HVDC subsea cable. It should not take 15 years to build extra capacity and redundancy along high traffic corridors above ground to help balance national and European demand. That is the problem.

Ultimately, those CfDs would be perfectly reasonable if they would build the sodding grid infrastructure instead of placating NIMBYs. Those wind farms getting built are crucial for the UK being a net energy exporter in 6 years but we won't be able to export the electricity if we can't get the power to the interconnectors.


RE: The cost of NIMBYism and obstructive planning in the energy sector - man in the corner shop - 12-05-2024

(12-05-2024, 07:05 PM)Borin' Baggie Wrote:
(12-05-2024, 06:55 PM)Kit Kat Chunky Wrote:
(12-05-2024, 06:47 PM)Borin' Baggie Wrote:
(12-05-2024, 06:09 PM)Protheroe Wrote:
(12-05-2024, 04:34 PM)Borin' Baggie Wrote: Labour have signalled that they want to streamline planning and get key energy transmission infrastructure built quicker (obviously dependent on the skilled labour being there to build it which is the other side of the problem) but the Tory councils on the coast are threatening legal action because pylons will spoil the view.

So Labour are being generally reasonable on the planning side, they've also taken the ESO back into public ownership in an attempt to clear a lot of red tape on the planning side.

I can't help thinking it might have been a good idea to have got the transmission infrastructure built in time to service the new generation capacity.

When it takes a couple of years to build an offshore wind farm and 15 years to facilitate a connection upgrade to enable said wind farm to operate fully 24/7/365, what exactly are you supposed to do for 13 years?

Don't build it in the first place and invest in your existing Nuclear Electric technology

Our current nuclear infrastructure is eol, the cost of maintenance will shoot up massively soon, new nuclear takes even longer to get online while having serious issues with securing funding from the public purse and private sector, and SMR is at least a decade away and the jury is out on the economics of that owing to small reactors not being anywhere near as efficient to run than larger reactors. I'm all for nuclear but that isn't a fix to this, is it?

Also, at the time of this comment at peak draw wind is currently accounting for 45% of electricity generation in the UK. That's an awful lot of power "not to build in the first place", compounded by the fact that the issue in the article relates to wind generating too much power for the grid to cope.

What we need to do is stop fucking about, streamline planning for grid infrastructure, tell the Green Party and Tory Party to go suck a lemon, relax immigration restrictions so we can make up the qualified labour shortages in the energy sector - particularly in connections and distribution - and invest a shit tonne of money into training.

Coming on here with your common sense solutions will rile up our resident Tory sock puppets. Watch it.


RE: The cost of NIMBYism and obstructive planning in the energy sector - Protheroe - 12-05-2024

(12-05-2024, 09:17 PM)Borin' Baggie Wrote:
(12-05-2024, 08:43 PM)Protheroe Wrote:
(12-05-2024, 08:33 PM)Borin' Baggie Wrote: When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.

Quite. I only worked in commercial development for 15 years BB, and even I know it could take 3 months for Western Power to do the regulated 12" joint between my substation and the warehouse I'd just built - let alone building swathes of pylons across the countryside.

Who on Earth was advising ministers to sign these cretinous deals? Who are "they"?

It took 3 years to build the IFA-2 and 4 years to get it to full flow - that is a 200km HVDC subsea cable. It should not take 15 years to build extra capacity and redundancy along high traffic corridors above ground to help balance national and European demand. That is the problem.

Ultimately, those CfDs would be perfectly reasonable if they would build the sodding grid infrastructure instead of placating NIMBYs. Those wind farms getting built are crucial for the UK being a net energy exporter in 6 years but we won't be able to export the electricity if we can't get the power to the interconnectors.

With respect, you haven't answered the question.


RE: The cost of NIMBYism and obstructive planning in the energy sector - Borin' Baggie - 12-05-2024

(12-05-2024, 10:01 PM)Protheroe Wrote:
(12-05-2024, 09:17 PM)Borin' Baggie Wrote:
(12-05-2024, 08:43 PM)Protheroe Wrote:
(12-05-2024, 08:33 PM)Borin' Baggie Wrote: When those CfDs were signed they didn't envisage it taking 15 years to open a grid connection to connect the wind farm, let alone build a trunk transmission system in coastal England or the Scottish borders. And it isn't the wind farm operators fault seeing as it's something entirely outside their scope that is restricting how much electricity can be supplied.

Quite. I only worked in commercial development for 15 years BB, and even I know it could take 3 months for Western Power to do the regulated 12" joint between my substation and the warehouse I'd just built - let alone building swathes of pylons across the countryside.

Who on Earth was advising ministers to sign these cretinous deals? Who are "they"?

It took 3 years to build the IFA-2 and 4 years to get it to full flow - that is a 200km HVDC subsea cable. It should not take 15 years to build extra capacity and redundancy along high traffic corridors above ground to help balance national and European demand. That is the problem.

Ultimately, those CfDs would be perfectly reasonable if they would build the sodding grid infrastructure instead of placating NIMBYs. Those wind farms getting built are crucial for the UK being a net energy exporter in 6 years but we won't be able to export the electricity if we can't get the power to the interconnectors.

With respect, you haven't answered the question.

The prices are set at an auction, so the market sets the prices based on the bids. Market analysts advice ministers what to base strike prices based on energy price indicators and supply chain costs, the government can choose to ignore that advice but then they may end up getting egg on their face like last year and have to rerun the auctions. "They" are private sector investors like SP, SSE, Orsted, Vattenfall, RWE, EDF, Equinor, Centrica etc. who would much rather have their wind farms operating as they get more from selling electricity to the Grid than they do from not having their wind turbines spinning.

You are barking up the wrong tree if you think the CfDs are the problem, it's a complete failure in grid planning going back to the break-up of CEGB and pandering to obstructive NIMBYs.